When a Great Park Building Design Meets the Reality of Construction

A bathroom for a park may seem as if it’s a tiny piece of a project worth millions. Landscape engineers, architects, and contractors may participate in the building of one structure.

Every transition brings up a simple, yet vital concern.

Who is responsible to ensure that the stages are connected correctly?

When park owners or project teams are discussing park restroom design, this may reveal more than studying a few completed structures.

Keep an eye out for Handoffs

Imagine a bathroom which is already conceptually designed. The dimensions are correct, the exterior is selected and everyone loves it.

Image credit: romtec.com

Then engineering begins. The layout is impacted by a necessary change. The alteration has an impact on a component’s specification and therefore the procurement. The contractor later finds that the assumption in the design does not match the specifications provided.

None of these issues necessarily mean that someone made a mistake of major magnitude. They demonstrate how difficult coordination can be when responsibilities are fragmented between several individuals.

The ideal park building designer candidate must therefore be judged on more than creativity. Understanding accessibility requirements, code and their components can help to connect your design with the end product.

Check the actual proposal

Two building plans that appear similar may actually have very different boundaries.

A typical one could cover the construction package. A second could include assistance with the design process renderings, drawings, sketches or plans that are engineered.

Comparing only the bottom-line price without understanding these differences can create a misleading comparison.

Romtec will offer you free preliminary designs and estimations, as well as drawings, specifications and renderings for the bid package. After acceptance the process can move on to engineered plans sets and final submissions.

This gives owners and designers an easier way to move from an idea to a design that is built.

Custom Requirements require early attention

Public projects rarely exist in the same conditions.

A community may require fixtures and other materials that are environmentally friendly. A specific architectural theme may be preferred by another community. A landscape architect may need customized siding, unique colors or a roof structure that visually connects the bathroom to other structures in the park.

These decisions have a greater impact than the appearance. They could affect parts, documentation procurement, engineering and construction.

Addressing specific requirements in the beginning gives the team working on the project an opportunity to include them with a purpose instead of trying to modify them after major decisions have been made.

Construction knowledge changes the conversation about design

The best park restroom builder for a particular project should understand that a drawing eventually has to become a physical structure.

Romtec is a firm that designs, produces, equipment and constructs buildings for public use. It offers building kits that integrate into larger construction projects or offer turnkey construction.

That design-to-construction experience creates a practical perspective: decisions made at a desk eventually have consequences on a jobsite.

Be sure to evaluate the journey, not Only the Goal.

It’s difficult to determine how much coordination was put into a finished bathroom prior to its opening.

Park owners see the building. Visitors look at the structure. The project teams are involved in everything that went before the design decision, estimates documents, engineering approvals, supply and construction.

So, choosing a park building partner shouldn’t start and end with asking “Do we enjoy their building?”

A more useful question is:

Can this company help us move from the building we envision to the one we can actually open to the public?

Don't hesitate to contact us any time.