Why Successful Pump Stations Begin With Site-Specific Engineering

It’s only later that a lift-station’s performance is determined. Flow calculations, site elevations systems pressure as well as wastewater characteristics, peak conditions access to maintenance, controls and future capacity all influence what will ultimately be constructed.

The main question important for the project’s owners to consider when comparing top lift station designers is not who can create the pumps. Who can translate the conditions of the site into a complete, practical system that is simple to install, maintain, and use?

Image credit: romtecutilities.com

Gravity has limits

Gravity is the most efficient means to transport wastewater. However, terrain and development patterns can not always be in favor of this method. New commercial, residential, and industrial buildings may be too low, far away, or in areas where the expansion of gravity sewers aren’t feasible.

The lift station is a mechanism that moves the wastewater to the next site of collection. However, the design process requires a thorough understanding of normal operation as well as less convenient circumstances like a high flow, maintenance of pumps, equipment failure or future increases in demand.

Companies considered among the best wastewater designers should therefore evaluate the entire conveyance problem rather than treating the station as an isolated piece of equipment.

Existing infrastructure makes the problem more complicated

Not only is new construction a problem, but it is also a major challenge. Municipalities frequently need to upgrade or replace aging stations, all while keeping their essential sanitation infrastructures in operation.

Existing infrastructure, including wet wells, force mains, control systems along with site boundaries and downstream infrastructure, can limit the design. Engineers must decide what is able to be left, what requires replacement and how new parts are to be incorporated into the current system.

Romtec Utilities offers pumping solutions for municipal, private industrial, commercial and retrofit applications. Pumping systems are adapted to meet the unique requirements of each project.

Stormwater is controlled by different rules

The best stromwater system designers with the provided search terms should solve a unique hydraulic issue. Stormwater systems may experience significant fluctuations in volume based on the rainfall, drainage area capacities for detention and discharge rates.

Stations that are serving detention basins for instance, may need to temporarily store runoff prior to pumping it out at a steady pace. Engineers should consider the flow, head conditions the requirements for environmental protection, flood-management goals, and the characteristics of the drainage system for which they are receiving.

Prefabrication is a way to move the work off-site

Field assembly is a complicated process that may cause scheduling conflicts, mistakes delays, reversals, and even changes orders. Romtec Utilities performs significant prefabrication of equipment prior the installation site is constructed.

If you can complete more assembly and quality control tasks in a controlled manner it can cut down on the amount of work required on the ground. Based on Romtec’s approach to project management, certain construction projects that otherwise would require weeks to complete could be completed in a matter of days, based on circumstances of the project.

The commitment to engineering success also includes commissioning

A station isn’t proven simply because every part is installed. Romtec Utilities is an installation advisor and will follow construction from beginning to end, including control panel check, pump operation, testing the system, and also personnel training. The documentation also provides information that users could refer to when they maintain the system or thinking about future expansion.

Owners who are looking for the most talented designers for lift stations must be aware of this last stage. A good engineer should be able to produce more than just a satisfactory set of sketches. The owner should have a functional system, skilled staff, useful documentation and equipment designed for the conditions that the station is expected to face in the course of daily operations.

Don't hesitate to contact us any time.